1992 – 2007 (15 years)
Supplier Quality Engineer
01/02/1992 – 30/04/1995 – Gent, Belgium
01/05/1995 – 30/04/1997 – Greensboro, NC, USA
01/02/1992 – 30/04/1995 – Gent, Belgium
01/05/1995 – 30/04/1997 – Greensboro, NC, USA
·
System and process audits
at suppliers ISO 9001
·
Initial sample testing
·
Trouble shooting
·
Projects: new heavy duty
trucks FH (EU) and VN (USA)
Production Engineer
01/05/1997 – 30/04/2000 – Gent
01/05/1997 – 30/04/2000 – Gent
·
Organizing workstations
·
Lay-out assembly line
·
Time studies
·
Assembly instructions
·
Risk analysis, FMEA
·
Projects:
-
New FL medium duty truck
-
Move glass and door locks
from Umeå to Gent.
Material Quality
01/05/2000 – 30/09/2007 – Gent, Belgium
01/05/2000 – 30/09/2007 – Gent, Belgium
·
Quality Cabs, Engines, Gearboxes,
Axles
·
Trouble shooting
assembly line
Johnson Controls Assenede, Belgium
2007 – 2013 (6 years)
Quality Coordinator Production
01/10/2007 – 31/12/2010
01/10/2007 – 31/12/2010
·
Team leader Quality, 6
persons
·
Customer complaints, 8D reports
·
Internal Audit
·
Lab product conformity
·
Noise lab (Buzz,
Squeak, Rattle)
·
Verification of Assembly
and test equipment (Poka Yoke’s)
·
Risk analysis, Process FMEA
·
Control plan
·
Projects:
-
Design verification
-
Validation design and
assembly line
-
Risk analysis, Design
FMEA
Manufacturing/Project engineer
01/01/2011 – 31/10/2013
01/01/2011 – 31/10/2013
·
Introduce new products
·
Process improvements
·
Design, develop and purchase
production equipment